💧 DampCheck · Dehumidifier size · Guides · Newsletter · Survey Kit

Painting and the Dew Point: the 3 °C Rule (ISO 8502-4)

Thin films of condensed water on a surface are mostly invisible, which is why ISO 8502-4 exists: it gives guidance on estimating the probability of condensation before painting[1][2].

The rule

Unless otherwise agreed, the steel surface temperature should generally be at least 3 °C above the dew point when paints are used. Moisture-tolerant paints may allow less, and the paint manufacturer or project spec may set other values[2].

Procedure (summary of ISO 8502-4)

  1. Measure air temperature and relative humidity near the surface.
  2. Calculate the dew point (use the calculator).
  3. Measure the surface temperature with a contact thermometer.
  4. Check the margin — and consider conditions over the application and drying period, which the standard notes is usually about 6 hours[2].

Instrument accuracy named in the standard

Scope note: ISO 8502-4 is written for steel substrates; many coating manufacturers apply the same 3 °C margin on other substrates, but always follow the product data sheet.

Sponsored slot · advertise here
Damp & Condensation Survey Kit — €9. Printable room-by-room damp survey checklist, condensation-risk chart (surface temperature vs indoor conditions), dew point charts °C/°F, dehumidifier sizing worksheet and full CSV data. Buy securely via Stripe → · What's inside

Sources

  1. ISO 8502-4:2017 – estimation of the probability of condensation prior to paint application
  2. ISO 8502-4:2017 public preview (iTeh)
  3. Alduchov & Eskridge (1996), Improved Magnus form approximation of saturation vapor pressure, J. Appl. Meteor.
The Humidity Brief — free weekly email: the week's news on damp, condensation, mould and dehumidifiers, every item linked to its publisher.
We store only your email address to send this newsletter; one-click unsubscribe deletes it. Privacy.